Lifetime

Please Select A Package

You can upgrade & downgrade your package at anytime

6gb Impact Package

$350/ Onetime

AMD Ryzen 9 5900X

Unmetered NVMe SSD Storage

Advanced DDOS Protection

8gb Impact Package

$450/ Onetime

AMD Ryzen 9 5900X

Unmetered NVMe SSD Storage

Advanced DDOS Protection

10gb Impact Package

$550/ Onetime

AMD Ryzen 9 5900X

Unmetered NVMe SSD Storage

Advanced DDOS Protection

12gb Impact Package

$650/ Onetime

AMD Ryzen 9 5900X

Unmetered NVMe SSD Storage

Advanced DDOS Protection

16gb Impact Package

$850/ Onetime

AMD Ryzen 9 5900X

Unmetered NVMe SSD Storage

Advanced DDOS Protection

Features

All the same features you get with any of our Performance class packages. Here is a few of them.

Support For All

We support every version, modpack, plugins, jar, mod, and version. Even custom ones.

One Click Modpack Downloads

Download any modpack of your choosing from our modpack installer, with a simple click.

Version Installer

Downloading versions is simple, with our one-click version installer.

Plugin Manager

Download an manage plugins with ease with in inbuilt Plugin Manager.

Change Game Any Time

Want to try a diffrent game. Change the game your server is running, at any time, to one of our supported games.

Split Your Server

Split unused resources into another server, at no additional cost.

Free Backups

Keep your files and server safe, with our backup manager.

MySQL Database

Access to a MySQL Database at no additional cost.

Sub Domain

Make your server look extra fancy with a custom subdomain.

Smart Settings

Config your server all from within a simple UI.

Unlimited Player Slots

We don't cap your player slots. Cram in all the players your server can handle.

24/7 Support

Our support team are always on hand to help you with any questions, or issues.

FAQ

If the questions you're looking for isn't here, please join our Discord or contact our sales team.

Is it really for life?

Yep, there is no catch and no hidden fees. You pay once and you get a lifetime of hosting.

What games does the packages support?

Servers will come preinstalled with Minecraft, but you can change this in the game swap tool. You may need to order an additional dedicated IP for some games.

How long will you be offering Lifetime server for?

Lifetime servers are only available while stocks last. Once they're gone, they're gone. If you're worried about missing out on a server, we'll update this page when stocks are low.

Do lifetime servers have different features or server specs?

Nope. You get all the same features and the server specs of our Performance packages. You'll also keep getting new features and improvements with our panel updates.

Should I chose an impact or performance server?

Both impact and performace servers come with the same features. The only difference is the hardware. The impact servers come with much faster CPUs, drives and RAM over the performance servers.

Kinetic Hosting Logo

Kinetic Hosting is owned and operated by Dapper Fox Group LTD.

Registered in England and Wales.

ICO Number: ZA841955

Company Number: 11439987

Designed and Developed in House by Dapper Fox